Page 15 - 2025年第56卷第8期
P. 15
一步开展常蓄结合式水电基地竞价交易策略研究;此外,常蓄结合式水电基地中,抽蓄电站与常规水
电站有可能是多个开发主体,多主体之间如何协调运行、协调运行后的效益如何在多主体之间进行分
配等问题也是未来的重点研究方向之一。
参 考 文 献:
[ 1 ] 王义民,刘世帆,李婷婷,等 . 雅砻江能源基地水风光互补短期调度运行模式对比研究[J] 水利学报,
.
2023,54(4):439-450.
[ 2 ] MA C, LIU L. Optimal capacity configuration of hydro-wind-PV hybrid system and its coordinative operation rules
considering the UHV transmission and reservoir operation requirements[J] Renewable Energy, 2022, 198:
.
637-653.
[ 3 ] 郭爱军,畅建霞,王义民,等 . 计及库容租赁与电量损益的混合式抽水蓄能电站容量电价计算[J] 水利学
.
报,2025,56(2):193-204.
[ 4 ] 陈帝伊,张猛,刘泳,等 . 考虑避振条件的水风光互补发电系统运行经济性评估[J] 水利学报,2024,55
.
(4):403-415.
[ 5 ] 彭煜民,刘德旭,王雪林,等 . 计及水库运行约束的极端气象场景下抽蓄电站优化调度研究[J] 水利学报,
.
2023,54(11):1298-1308
[ 6 ] ZHANG J, GUO A, WANG Y, et al. How to achieve optimal photovoltaic plant capacity in hydro-photovoltaic
complementary systems: fully coupling long-term and short-term operational modes of cascade hydropower plants
[J] Energy,2024,313:134161.
.
[ 7 ] JING Z, WANG Y, CHANG J, et al. Construction of pumped storage power stations among cascade reservoirs to
.
support the high-quality power supply of the hydro-wind-photovoltaic power generation system[J] Energy Conver‐
sion and Management,2025,323:119239.
[ 8 ] 罗彬,陈永灿,苗树敏,等 . 融合改造的混合式抽水蓄能与风电联合运行短期调度模型[J] 水利学报,
.
2023,54(8):955-966
[ 9 ] TAN Q, NIE Z, WEN X, et al. Complementary scheduling rules for hybrid pumped storage hydropower-
photovoltaic power system reconstructing from conventional cascade hydropower stations[J] Applied Energy,2024,
.
355:122250
[ 10] HUNT J D, ZAKERI B, LOPES R, et al. Existing and new arrangements of pumped-hydro storage plants[J]
.
Renewable and Sustainable Energy Reviews,2020,129:109914.
[ 11] DEANE J P,GALLACHÓIR B P Ó,MCKEOGH E J. Techno-economic review of existing and new pumped hydro
.
energy storage plant[J] Renewable and Sustainable Energy Reviews,2010,14(4):1293-1302
[ 12] YURTER G,NADAR E,KOCAMAN A S. The impact of pumped hydro energy storage configurations on investment
.
planning of hybrid systems with renewables[J] Renewable Energy,2024,222:119906.
[ 13] JU C, DING T, JIA W, et al. Two-stage robust unit commitment with the cascade hydropower stations retrofitted
.
with pump stations[J] Applied Energy,2023,334:120675.
.
[ 14] 郭爱军,畅建霞,王义民,等 . 含混合式抽蓄的梯级水电站短期临界调峰模式[J] 水利学报,2024,55
(10):1210-1220,1235.
[ 15] KOCAMAN A S,MODI V. Value of pumped hydro storage in a hybrid energy generation and allocation system[J] .
Applied Energy,2017,205:1202-1215.
[ 16] MAHFOUD R J,ALKAYEM N F,ZHANG Y,et al. Optimal operation of pumped hydro storage-based energy sys‐
tems:A compendium of current challenges and future perspectives[J] Renewable and Sustainable Energy Reviews,
.
2023,178:113267.
[ 17] 刘欣雨,罗彬,陈永灿,等 . 融合改造的梯级混合式抽蓄短期调峰优化模型[J] 电网技术,2025,49(3):
.
1217-1226.
[ 18] WANG H,TAN X,LU X,et al. Quantitative evaluation and optimization of synergistic regulation performance con‐
sidering wear in short-term response of hybrid pumped storage systems[J] Renewable Energy, 2024, 237:
.
— 979 —